Power Trip Energy Solar PV Projects These are some of the solar pv systems we have installed on the Olympic and Kitsap Peninsulas. Port Townsend solar installation 2024 Phase II Expansion in Bremerton 2024 Phase II Expansion in Sequim 2024 Port Townsend Phase II Expansion 2024 19.36 kW Kingston Array 2024 22.78 kW Port Ludlow Array 2024 2 kW Expansion in Port Townsend 14 kW Port Townsend 2024 13.5 kW Cape George Array 2021 Blue Heron Middle School, 100 KW, Port Townsend, 2023 11.45 Kw, Sequim, 2023 4.91 KW, Port Townsend, 2023 6.54 KW, Port Angeles, 2023 Blackie Residence, 6.54 KW, Port Angeles, 2023 Girard Residence, 10.79 KW, Port Ludlow, 2023 9.16 KW, Sequim, 2023 13.08 KW, Port Townsend, 2023 Cloutier Residence, 19.62 KW, Poulsbo, 2023 7.52 KW, Sequim, 2022 Bennett Residence, 7.2 KW, Port Angeles, 2022 8.5 KW, Poulsbo, 2022 14.88 KW, Port Townsend, 2022 9.81 KW, Norland, 2022 11.77 KW, Norland, 2022 Campbell Residence, 7.85 KW, Port Orchard, 2022 7.59 KW, Port Angeles, 2022 9.81 KW, Keyport, 2022 10.14 KW, Port Orchard, 2022 7.65 KW, Port Townsend, 2022 8.08 KW, Port Angeles, 2022 6.54 KW, Sequim, 2022 Shafer Residence, 21.25 KW, Port Angeles, 2022 « Older Entries