This Phase II installation is tied to the Clallam PUD grid and consists of 30 SunPower 327 watt modules and a Fronius 11.4 KW inverter.
Residence, 9.81 KW, Sequim, 2014
Projects
This Phase II installation is tied to the Clallam PUD grid and consists of 30 SunPower 327 watt modules and a Fronius 11.4 KW inverter.