Anderson Residence, 2 KW, Port Angeles, 2005

2 KW grid tied on Clallam PUD grid with Evergreen PV and SMA SunnyBoy 1800 inverter.
Port Angeles is an excellent location for solar – and it is one of our busiest locations on the Peninsula. The North Olympic Peninsula averages approximately 3.5 hours of full sun per day. That is about 70% of the sun resources of southern California. This makes grid-tied solar installations very popular in Port Angeles. Power Trip Energy has installed many solar PV systems in PA over the years; here are a few of our latest projects:
2 KW grid tied on Clallam PUD grid with Evergreen PV and SMA SunnyBoy 1800 inverter.
This was the first project completed by Power Trip Energy once Steve joined the company, we incorporated, and became electrical contractors. This was also our first installation utilizing the S-5 clamps on a standing seam metal roof.
This is the second grid-tied pv project in Clallam County. Carol and Gary proved to be excellent advocates for grid-tied pv with the local utility and local Labor and Industries office.
Solar World 260 modules feed into a PVI-6000 inverter. This array produces 5.75KW of power.