Eden Valley, 2006, 4.2 KW

Port Angeles is an excellent location for solar – and it is one of our busiest locations on the Peninsula. The North Olympic Peninsula averages approximately 3.5 hours of full sun per day. That is about 70% of the sun resources of southern California. This makes grid-tied solar installations very popular in Port Angeles. Power Trip Energy has installed many solar PV systems in PA over the years; here are a few of our latest projects:
This was the first project completed by Power Trip Energy once Steve joined the company, we incorporated, and became electrical contractors. This was also our first installation utilizing the S-5 clamps on a standing seam metal roof.
This is the second grid-tied pv project in Clallam County. Carol and Gary proved to be excellent advocates for grid-tied pv with the local utility and local Labor and Industries office.
Solar World 260 modules feed into a PVI-6000 inverter. This array produces 5.75KW of power.