This 2nd phase was installed on the South facing garage roof. They are now able to achieve 100% production vs consumption with this additional system.
Residence Phase II, 5.36kW, Sequim, 2018
Projects![](https://powertripenergy.com/wp-content/uploads/Crawford-Korpi-Spring-2018-1080x608.jpg)
This 2nd phase was installed on the South facing garage roof. They are now able to achieve 100% production vs consumption with this additional system.