Volk-Korb, 2.64 KW, Joyce, WA

Volk-Korb, 2.64 KW, Joyce, WA

This is the second grid-tied pv project in Clallam County.  Carol and Gary proved to be excellent advocates for grid-tied pv with the local utility and local Labor and Industries office.
MacRobbie Residence, 3 KW, Sequim, April 2003

MacRobbie Residence, 3 KW, Sequim, April 2003

Stuart and Pat MacRobbie asked us to install the first grid-tied pv system in Clallam County in April of 2003.  The system was composed of 18 Sharp 165 watt pv modules, 12 of which were on a tracker in the front yard.  This tracker would eventually find a home back...
Doughty Residence, 3 KW, Port Townsend, 2003

Doughty Residence, 3 KW, Port Townsend, 2003

Lee Doughty was the first person in Jefferson County to have Power Trip Energy set up a grid-tied pv system at his home.  We were not contractors at this point, and had Lee hire Puget Sound Solar to expertly perform this installation.   The installation used 18 Sharp...