Meyers Residence, 3 KW, Sequim, 2004

Meyers Residence, 3 KW, Sequim, 2004

This home also had several other great energy efficient characteristics, beautiful finish work inside, and a sweet view of Sequim Bay.  Of note, this was the final Power Trip Energy installation performed by Puget Sound Solar.  After this project, Steve and Graham...
Volk-Korb, 2.64 KW, Joyce, WA

Volk-Korb, 2.64 KW, Joyce, WA

This is the second grid-tied pv project in Clallam County.  Carol and Gary proved to be excellent advocates for grid-tied pv with the local utility and local Labor and Industries office.
MacRobbie Residence, 3 KW, Sequim, April 2003

MacRobbie Residence, 3 KW, Sequim, April 2003

Stuart and Pat MacRobbie asked us to install the first grid-tied pv system in Clallam County in April of 2003.  The system was composed of 18 Sharp 165 watt pv modules, 12 of which were on a tracker in the front yard.  This tracker would eventually find a home back...
Doughty Residence, 3 KW, Port Townsend, 2003

Doughty Residence, 3 KW, Port Townsend, 2003

Lee Doughty was the first person in Jefferson County to have Power Trip Energy set up a grid-tied pv system at his home.  We were not contractors at this point, and had Lee hire Puget Sound Solar to expertly perform this installation.   The installation used 18 Sharp...
Wild Birds Unlimited, 9.62 KW, Gardiner, 2013

Wild Birds Unlimited, 9.62 KW, Gardiner, 2013

Solar World 260 modules on both south and east-facing roofs feed into two PowerOne PVI inverters.  This design works well because of the PVI’s multiple MPPT inputs and the array produces 9.62KW of power.  We also installed a Level II EV charger that the business...
Sequim 5.07KW

Sequim 5.07KW

Residence in Sequim, WA. April 2013 SiE 195 modules feed into two SiE 5.3 inverters. This array produces 5.07KW of power.